Location
  • Merkel, TX
Services Provided
  • Civil
  • Structural

Project Case Study

Merkel ISD


The new school is a steel framed, two story structure with total area of approximately 100,000 square feet. The facility includes two classroom wings, gymnasium, locker rooms, offices, and cafeteria. Steel framing is exposed in the entry lobby area of the school. Gessner provided both civil and structural engineering.