Kyle Field


Gessner Engineering provided geotechnical engineering for the ongoing redevelopment of Kyle Field. The redevelopment of Kyle Field is the largest redevelopment project in the history of collegiate athletics. The project scope consisted of drilling fourteen (14) test borings to 100 feet each within the perimeter of the south stands, west stands, east stands, and circulation towers; four (4) test borings to eighty (80) feet within the perimeter of the proposed below grade parking areas and eight (8) test borings to sixty (60) feet within the perimeter of the proposed above grade parking areas. Recommendations and construction assistance were provided regarding foundation construction and field excavations, with challenges including shallow groundwater, low clearance areas and conflicts with existing foundations.